Ethio Construction Engineering
6. The nominal lead and lift allowed for the earthwork in the excavations of the foundations are:
Anonymous Quiz
30 m and 1.5 m
20 m and 1.5 m
15 m and 3.0 m
20 m and 3.0 m
Comments
Be the first to add a comment