‎👉Interview Questions For Building Construction Engineers

🏷ለቢውልዲንግ መሃንዲሶች ለስራና ለዩኒቨርስቲ መውጫ የተዘጋጀ ጥያቄ

‎1. As you are a construction Engineer, Why are building finishes important in construction projects?
‎
They protect structural elements, improve durability, functionality, and enhance aesthetics.
‎
‎2. What checks are required before starting plastering works?
‎
Surface cleaning, alignment check, proper curing of masonry, service concealment completion, and approval.
‎
‎3. What is the standard thickness of internal and external plaster?
‎
Internal: 12–15 mm
‎External: 15–20 mm (often in two coats).
‎
‎4. What causes cracks in plaster and how are they controlled?
‎
Shrinkage, poor mix, improper curing, and thermal movement; controlled by proper mix, curing, and mesh at junctions.
‎
‎5. What is the purpose of expansion or control joints in buildings?
‎
To accommodate movement and prevent random cracking.
‎
‎6. What checks are required before floor screeding?
‎
Surface cleanliness, level marking, correct slope, service completion, and material approval.
‎
‎7. As you are a construction foreman What is the recommended screed thickness for building floors?
‎
Typically 40–50 mm for bonded screed unless otherwise specified.
‎
‎8. What are the key quality checks for tiling works?
‎
Tile alignment, joint spacing, level, slope to drain, adhesive coverage, and grout quality.
‎
‎9. What causes tile debonding or hollow sound?
‎
Poor surface preparation, insufficient adhesive, movement, or moisture ingress.
‎
‎10. What is waterproofing and where is it critical in buildings?
‎
Protection against water penetration; critical in toilets, kitchens, roofs, basements, and balconies.

🚧For more information click this Link Below And Subscribe Our YouTube Channel👇

https://youtube.com/@ethiopianconstruction7?si=ils307xXQQpIdCwG

@etconp

Comments

Be the first to add a comment