👉Some Important Questions*part 1*
*1: what is Development Length?*
*Ans:* Development length is an extera length of steel, which transter the load from one steel bar to other.
*2: What is Hydration?*
*Ans:* Hydration is reaction b/w cement and water.
*3: What is M20 Grad Concrete?*
*Ans:* “M” Stands for Mix and No (20) is the Compressive strength of concrete in 20N/mm2 after 28 days after laboratory test. and M20 grad concrete we have to use in the RCC slab.
*4: What is Water Cement ratio?*
*Ans:* water–cement ratio is the ratio of the weight of water to the weight of cement used in a concrete mix.
*5: What is Bearing Capacity of Soil?*
*Ans:* Bearing Capacity is the capacity of soil to support the load applied to the ground.
*6: Time to removal of Fromwork for different RCC structures?*
*Ans:* For column/walls, vertical form works should be detached after 16 to 24 hours.
Soffit formwork to slab (formwork is located under the slab), the form works can be removed after 3 days. (props should be reaffixed once the removal is done).
Soffit formwork to beam, the form works can be removed after 7 days. (props should be reaffixed once the removal is done.)
Beam that spans up to 4.5 m (length), the form works can be removed after 7 days.
Beam that spans surpassing 4.5 m (length), the form works can be removed after 14 days.
For footing, the formworks can be removed after 16 to 24 hours.
For staircase, the form works can be removed after 5 days.
7, When we use pile foundation?
Pile foundation is adopted when the Soil Bearing Capacity is less than 24 KN/m3