👉Building Finishes, Services Coordination & Defect Management (Practical & Technical)

‎1. Why are building finishes important in construction projects?

‎They protect structural elements, improve durability, functionality, and enhance aesthetics.
‎
‎2. What checks are required before starting plastering works?

‎Surface cleaning, alignment check, proper curing of masonry, service concealment completion, and approval.
‎
‎3. What is the standard thickness of internal and external plaster?

‎Internal: 12–15 mm
‎External: 15–20 mm (often in two coats).
‎
‎4. What causes cracks in plaster and how are they controlled?

‎Shrinkage, poor mix, improper curing, and thermal movement; controlled by proper mix, curing, and mesh at junctions.
‎
‎5. What is the purpose of expansion or control joints in buildings?

‎To accommodate movement and prevent random cracking.
‎
‎6. What checks are required before floor screeding?

‎Surface cleanliness, level marking, correct slope, service completion, and material approval.
‎
‎7. What is the recommended screed thickness for building floors?

‎Typically 40–50 mm for bonded screed unless otherwise specified.
‎
‎8. What are the key quality checks for tiling works?

‎Tile alignment, joint spacing, level, slope to drain, adhesive coverage, and grout quality.
‎
‎9. What causes tile debonding or hollow sound?

‎Poor surface preparation, insufficient adhesive, movement, or moisture ingress.
‎
‎10. What is waterproofing and where is it critical in buildings?
‎
Protection against water penetration; critical in toilets, kitchens, roofs, basements, and balconies.
‎
‎11. What are common waterproofing systems used in buildings?

‎Cementitious coating, bituminous membrane, liquid-applied membranes, and PVC membranes.
‎
‎12. What tests are conducted after waterproofing application?

‎Flood (ponding) test for 24–72 hours and visual inspection.
‎
‎13. What coordination checks are required between civil and MEP works?

‎Pipe routing, sleeves, conduits, access panels, and service clearances.
‎
‎14. What is snag list in building projects?

‎A documented list of defects and incomplete works prepared before handover.
‎
‎15. What is rectification period?

‎The time allowed to correct identified defects before final acceptance.
‎
‎16. What are common finishing defects in buildings?

‎Uneven plaster, paint peeling, leakage, cracked tiles, and misaligned fixtures.
‎
‎17. How do you manage defects during finishing stage?

‎Inspection, documentation, assignment, rectification, and re-inspection.
‎
‎18. What documents are required for final building handover?

‎As-built drawings, test reports, warranties, O&M manuals, and completion certificate.
‎
‎19. What is preventive maintenance in building projects?

‎Planned inspections and minor repairs to extend service life.
‎
‎20. What records should be maintained for building finishes and defects?

‎Inspection reports, snag lists, rectification logs, test results, and handover documents.
‎