🏗️ CAST-IN-PLACE PILE: CONSTRUCTION PROCEDURE
A cast-in-place pile is a deep foundation constructed by drilling a borehole and filling it with reinforced concrete to transfer structural loads to stronger soil layers.
🔹 1. Drilling: Excavate the borehole to the required depth and diameter using a drilling rig.
🔹 2. Reinforcement: Lower the reinforcement cage and install spacers to maintain concrete cover.
🔹 3. Concreting: Place concrete into the borehole, using a tremie pipe where required.
🔹 4. Quality Control: Check borehole depth, cleanliness, reinforcement positioning, concrete quality, and perform specified pile tests.
🔹 Main Equipment: Drilling rig, auger, reinforcement cage, concrete mixer truck, and tremie pipe.
📌 Note: Construction procedures depend on soil conditions, groundwater levels, and project specifications.