🏗️ Interlocking Pavement – Layers & Construction Details🔹 Main Layers (Top to Bottom)1,
Concrete Edge Restraint: Prevents paver movement.
2,
Concrete Pavers: 60–100 mm thick.
3,
Joint Sand: Locks pavers together.
4,
Bedding Sand: 20–40 mm thick.
5,
Crushed Stone Base: 100–150 mm thick.
6,
Sub-base: 150–300 mm thick.
7,
Compacted Subgrade: Provides a stable foundation.
🔹 Key Construction Tips✅ Use quality concrete pavers.
✅ Compact each layer properly.
✅ Provide a 1–2% slope for drainage.
✅ Install proper edge restraints.
✅ Adjust layer thickness according to traffic load and soil conditions.
@ETCONP