👉If Ready-Mix Concrete (RMC) has already started to set while pouring, you must be very careful.
💫The correct action depends on how far setting has progressed.
✅ If concrete is only losing workability (early stiffening)
🚧You can add a compatibility-approved chemical admixture such as:
⭐️1. Superplasticizer / High Range Water Reducer (HRWR)
⏺Restores workability without adding water
⏺Maintains strength and durability
🏷Common types:
*Polycarboxylate Ether (PCE)
*Naphthalene-based
✅ This is the best and safest option when setting has just started.
💫2. Retarding Admixture (only if approved by mix designer)
⏺Slows down further setting
⏺Useful in hot weather or long transport time
❌ What NOT to do
⏺Do NOT add water indiscriminately → reduces strength & causes segregation
⏺Do NOT remix concrete that has begun hard setting or initial set
⏺Do NOT add cement on site
🚨 If concrete has reached initial set
⏺DO NOT try to re-temper
⏺Reject the batch
⏺Remove and replace
✅ Practical Site Action Steps
⏺1. Check concrete temperature & slump
⏺2. If slump is low but still plastic → add approved superplasticizer as per supplier dosage
⏺3. Remix truck for 30–60 revolutions
⏺4. Re-test slump before placing
📍Typical Dosage (Guide only)
⏺Super plasticizer: 0.8 – 1.5% of cement weight (Exact dosage must follow supplier data sheet)
@etconp