PRP pool = 60,000 ETB Schedule 40%, Cost 30%, Safety 30% Performance: Schedule 95%, Cost 85%, Safety 70% Safety penalty = 10% deduction Calculate final PRP.
Anonymous Quiz
A) 50,850 ETB
B) 48,600 ETB
C) 49,440 ETB
D) 51,000 ETB

1 comment

መልስ:


Weights: Schedule 40%, Cost 30%, Safety 30%
Performance: 95%, 85%, 70%
Weighted score = (0.40×0.95) + (0.30×0.85) + (0.30×0.70)

= 0.38 + 0.255 + 0.21 = 0.845 (84.5%)

Apply safety penalty 10% to the payout:


Adjusted factor = 0.845 × (1 − 0.10) = 0.7605

Final PRP:


60,000 birr × 0.7605 = 45,630 birr

Answer: 45,630 birr.