Ethio Construction Engineering
3182. In which type of estimate are the length, breadth and depth of each item taken out from drawings, quantities of each item calculated, and abstracting and billing done?
Anonymous Quiz
(a) Detailed estimate
(b) Plinth area rate estimation method
(c) Approximate quantity estimation method
(d) Cubic rate estimation method
Comments
Be the first to add a comment